PM 582 Work Breakdown Structure


S
Asked by 3 years ago
0 points

PM 582 Work Breakdown Structure

PM 582

Work Breakdown Structure

Riordan Manufacturing, a plastics injection molding manufacturer, is pursuing a Go Green project with the intent of achieving International Organization of Standardizations 14001 certification. They have identified a project team that will analyze the project and suggest initiatives to accomplish the goals. This analysis will include a Work Break Down structure of the Go Green project, what role the project manager has in creating the WBS, any strategies they will be using to interpret the scope statement, to conduct relevant research and to develop the WBS.

Scope Statement

The project manager for the Riordan Go Green project needs to interpret the project scope through a step by step process. The first strategy...

PM 582
solarc

1 Answer

S
Answered by 3 years ago
0 points

Oh Snap! This Answer is Locked

PM 582 Work Breakdown Structure

Thumbnail of first page

Excerpt from file: Runninghead:WORKBREAKDOWNSTRUCTURE PM582WorkBreakdownStructure PM582 1 WORKBREAKDOWNSTRUCTURE2 WorkBreakdownStructure RiordanManufacturing,aplasticsinjectionmoldingmanufacturer,ispursuingaGoGreen...

Filename: pm-582-work-breakdown-structure-82.docx

Filesize: < 2 MB

Downloads: 1

Print Length: 10 Pages/Slides

Words: 423

Your Answer

Surround your text in *italics* or **bold**, to write a math equation use, for example, $x^2+2x+1=0$ or $$\beta^2-1=0$$

Use LaTeX to type formulas and markdown to format text. See example.

Sign up or Log in

  • Answer the question above my logging into the following networks
Sign in
Sign in
Sign in

Post as a guest

  • Your email will not be shared or posted anywhere on our site
  •  

Stats
Views: 15
Asked: 3 years ago

Related